Complete in-season reconstruction of the Crown Oil Arena pitch, incorporating drainage, irrigation, pitch-profile construction and hybrid carpet installation. Delivered within a controlled Christmas fixture window without disrupting the club’s match schedule.
Restoration of golf course and spectator areas following The 154th Open, including turf removal, surface preparation, returfing, aeration and overseeding. Approximately 89,000m² was restored across the course and associated event areas.
Complete reconstruction and extension of Murrayfield’s playing surface, integrating new pitch profiles, irrigation alterations, undersoil-heating extensions, GrassMaster hybrid reinforcement and synthetic technical areas to create a more resilient elite rugby surface.
Full reconstruction of the Deepdale stadium pitch, including earthworks, drainage, pitch-profile construction, irrigation and heating coordination, seeding and stitched-hybrid reinforcement. Approximately 5,000 tonnes of material was imported during the controlled close-season programme.
Development of the new Farington county and community cricket ground, including engineered outfields and squares, drainage, irrigation, hybrid reinforcement and practice infrastructure. The coordinated programme delivered two performance outfields and eighteen cricket pitches.
Complete reconstruction of the Bramall Lane pitch, including new rootzone profiles, irrigation, stitched-hybrid reinforcement, synthetic surrounds and remodelling of perimeter slopes to improve surface durability, stadium presentation and operational space.