Mallinson delivered the complete reconstruction and extension of Murrayfield’s playing surface, integrating reconstructed pitch profiles, irrigation alterations, undersoil-heating extensions, GrassMaster hybrid reinforcement and synthetic technical areas.
The coordinated project created an integrated elite rugby surface with upgraded infrastructure and improved long-term resilience.
Scottish Gas Murrayfield required a complete reconstruction and extension of its elite rugby surface, with the new works integrated into the stadium’s existing irrigation and undersoil-heating infrastructure.
The pitch profile, services, hybrid reinforcement and synthetic technical areas had to function as one coordinated system. Accurate levels, interfaces and sequencing were critical because each operation directly affected the installation and performance of the next.
Mallinson coordinated the specialist construction package from pitch-profile works through to hybrid reinforcement and final surface integration.
Reconstruction and extension of the pitch profile
Formation preparation and precision grading
Alterations to the existing irrigation system
Extension of the undersoil-heating system
GrassMaster stitched-hybrid reinforcement
Construction of synthetic technical areas
Surface establishment and preparation for handover
Coordination of specialist systems and stadium interfaces
The completed project delivered an integrated hybrid rugby surface across the reconstructed and extended playing area, supported by coordinated irrigation, undersoil heating and synthetic technical infrastructure.
By managing the pitch construction, specialist systems and GrassMaster reinforcement through one coordinated programme, Mallinson reduced interface risk and created a more resilient surface suitable for elite stadium use.
Speak to Mallinson about construction, renovation or specialist systems for your facility.