Following the 154th Open, Mallinson delivered a coordinated restitution programme across Royal Birkdale Golf Club and the former spectator-village areas.
Approximately 89,000 m² was reinstated across the club entrance, practice range, car park and affected course areas using a combination of turf removal, surface preparation, returfing, aeration and overseeding.
Following The 154th Open, large areas used for spectator access, temporary event infrastructure and operational compounds required planned reinstatement.
The works extended across the club entrance, practice range, car park and affected course areas. Each location required a different treatment, with turf removal, surface preparation, returfing, aeration and overseeding coordinated across one extensive site while protecting the surrounding retained surfaces.
Mallinson coordinated the restitution programme across multiple locations, selecting the appropriate treatment for the condition and intended use of each area.
Removal of worn or unsuitable turf
Surface cultivation, preparation and levelling
Supply and installation of Arena Gold big-roll turf
Aeration of affected turf areas
Overseeding using appropriate fescue and rough mixtures
Reinstatement of the club entrance, practice range, car park and affected course areas
Coordination of plant, materials and site logistics across the programme
Nearly 90,000m² of course and event-affected land was reinstated through a coordinated programme of surface preparation, returfing, aeration and overseeding.
The project demonstrates Mallinson’s capability to mobilise and manage large-scale restitution works for major sporting events, applying the appropriate treatment to each area while maintaining consistent delivery across an extensive and operationally complex site.